EasyManua.ls Logo

NEC Univerge SV9100 - Figure 4-33 Install the CR-2032 Battery

NEC Univerge SV9100
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 3.0
4-88 Installing the SV9100 Blades
Two USB 1.0 ports for USB keyboard support, database backup and
software upgrades
One 15-pin VGA connector for VHA monitor support
6.1.2 Installation
Only one GCD-VM00 can be installed per system.
1. Wear a grounding strap while handling the GCD-VM00 and lay it on a
flat workspace.
2. Mount the CR-2032 battery with the + side up in the BATT slot on the
GCD-VM00 (refer to Figure 4-33 Install the CR-2032 Battery).
3. To Install the SO-DIMM memory on the GCD-VM00 blade, insert the
end with the brass connectors into the CN14 1 slot first.
4. Push the other end down until the lock on both sides locks into place
(refer to Figure 4-34 Install the SO-DIMM Memory on page 4-89).
WARNING
Handle the CF drive carefully. To prevent damage, do not
drop the drive or apply pressure to it.
This unit makes extensive use of CMOS technology and is
very susceptible to static; extreme care must be taken to
avoid static discharge when handling
Figure 4-33 Install the CR-2032 Battery

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals