SV9100 System Hardware Manual 3-77
4. Using supplied screws, secure the CHS2UG STAND KIT (K) to the
floor (refer to Figure 3-94 Install Additional Brackets from CHS2UG
JOINT BRACKET KIT).
5. Connect the ground wire to all chassis. Refer to 3.3.3 Install
Grounding on 19” Chassis on page 3-19 for complete details on
grounding the system.
6. Refer to 3.3.5 Install AC Power Cords on 19” Chassis on page 3-20 to
continue installation of the chassis or, Chapter 6 paragraph 2.1
Installation and Safety Precautions on page 4-4 for installation of
blades.
Figure 3-94 Install Additional Brackets from CHS2UG JOINT BRACKET KIT
To prevent possible damage to the 19” chassis due to
falling, NEC recommends screws be installed in the
stand mount brackets as soon as possible.