Issue 3.0
SV9100 System Hardware Manual 6-31
14. Remove the connector cover (rubber) from the bottom of the multiline
terminal.
15. Insert the lower claws of the Bottom Unit (see Figure 6-38 Installing
the Bottom Unit) into precut holes on the multiline terminal.
16. Align connector on inside of bottom unit and push down until unit
snaps into place.
17. Push the latch to release the cover (see Figure 6-39 Stowing the
Bottom Unit Cable). Stow the extra bottom unit connecting cable and
close the cover.
Figure 6-37 Removing the Connector Cover
Figure 6-38 Installing the Bottom Unit