EasyManua.ls Logo

NEC Univerge SV9100 - Figure 3-26 9.5 Chassis (Front View); Installing the 9.5 Gateway (CHS2 UG GW-US) and Base

NEC Univerge SV9100
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 3.0
3-22 Installing the SV9100 Chassis
3.4 Installing the 9.5” Gateway (CHS2UG GW-US) and Base
(CHS2UG B-US) Chassis
The CHS2UG GW-US and the CHS2UG B-US chassis have three universal blade
slots for station, trunk and optional blades.
Before proceeding with installation of chassis, ensure site preparation is
completed. The Gateway (CHS2UG GW-US) chassis can be:
Wall-mounted – refer to 4.2 Wall Mounting the 9.5” Gateway (CHS2UG GW-US)
and Base (CHS2UG B-US) Chassis on page 3-46.
Stand-mounted – refer to 6.2 Stand Mounting the 9.5” CHS2UG B Chassis on
page 3-78.
The Base (CHS2UG B-US) chassis can be:
Wall-mounted – refer to 4.2 Wall Mounting the 9.5” Gateway (CHS2UG GW-US)
and Base (CHS2UG B-US) Chassis on page 3-46.
Stand-mounted refer to 6.2 Stand Mounting the 9.5” CHS2UG B Chassis on
page 3-78.
From the factory, the SG, ETH and PBXG grounds are located inside the chassis
and are connected to the FG (frame ground) on the back of the chassis.
Figure 3-26 9.5” Chassis (Front View)
3 Universal Slots
(Slot 1 for CPU)
Power Switch
and LED

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals