EasyManua.ls Logo

NEC Univerge SV9100 - Figure 3-69 Chassis Installed (Base and Expansion Chassis)

NEC Univerge SV9100
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 3.0
SV9100 System Hardware Manual 3-57
7. Connect grounding wire to chassis. Refer to Chapter 4
paragraph 3.5 Installing the 9.5” Base (CHS2UG B-US) and
Expansion (CHS2UG E) Chassis on page 3-24 for complete
details on grounding the system.
8. Refer to 3.5.5 Install AC Power Cord on 9.5” Base and
Expansion Chassis on page 3-37 for installation of the
power cord or, Chapter 6 paragraph 2.1 Installation and
Safety Precautions on page 4-4 for installation of blades.
Figure 3-69 Chassis Installed (Base and Expansion Chassis)

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals