EasyManua.ls Logo

NEC Univerge SV9100 - Chapter 9 Installing SV9100 Optional Equipment; Figure 9-1 PGD(2)-U10 ADP; Table 9-1 PGD(2)-U10 ADP LED Indications

NEC Univerge SV9100
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 3.0
9-2 Installing SV9100 Optional Equipment
The PGD(2)-U10 ADP connects to any available digital extension port. The
terminal connections made in the PGD(2)-U10 ADP and the jumper settings
determine what features are used for each circuit.
2.2 LED Indications
Table 9-1 PGD(2)-U10 ADP LED Indications lists the LED indications and
provides a brief description of each.
2.3 Setting up PGD(2)-U10 ADP Connections
This sections provides instructions for setting up the PGD(2)-U10 ADP
connections.
Figure 9-1 PGD(2)-U10 ADP
Channel 2
Status LED
Channel 1
Status LED
Table 9-1 PGD(2)-U10 ADP LED Indications
LED Indication Note
LED 1
Green LED when
CH1 in use.
Flashing green LED indicates DIP Switch setting
and programming for CH1 are conflicting.
LED 2
Green LED when
CH2 in use.
Flashing green LED indicates DIP Switch setting
and programming for CH2 are conflicting.
CAUTION
If the PGD(2)-U10 ADP is to be wall mounted, all the cable
connections should be made first.
For the module to ID correctly after setting the jumpers, set the circuit
type to 0 for the module port in Program 10-03-01 prior to connecting
the line cord to the PGD(2)-U10 ADP.

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals