Issue 3.0
SV9100 System Hardware Manual 3-33
3.5.2.3 Install the GPZ-BS11 Expansion Blade in the
CHS2UG B-US Expansion Chassis
1. Ensure the chassis is powered down.
2. Locate the door positioned on the left end (expansion bay)
of the Expansion Chassis.
3. From the right side of the door, pinch the Door Clip and pull
the cover outward to expose the expansion bay.
4. Pull the cover toward you to remove.
5. Remove knockout in center of cover.
Figure 3-40 GPZ-BS11 Components
For the Expansion Chassis to function, the
GPZ-BS10 blade must be installed in Controlling
Chassis.
Do not remove or install this blade with the power
on.
Figure 3-41 CHS2UG B-US Expansion Bay
Cover must be removed prior to installation
of GPZ-BS11 blade.