7-16 Installing SV9100 Wireless Telephones
Install the Base Station
1. Connect a standard Ethernet cable (Cat 5 or higher) to the Ethernet/
PoE jack on the rear of the base station.
2. Route the cable through the channel.
Power over Ethernet
The DAPs support Power over Ethernet, the so called PoE
(described down in IEEE802.3af specification).
The following overview gives the specifications of the PoE:
Voltage at the AP400: minimum 36 volts, maximum 57 volts.
Connector: Standard RJ45 connector, using the spare wires pins
(wires). Refer to Table 7-6 DAP RJ-45 Pinouts on page 7-17 Pin
Layout Ethernet Connector RJ45 on the DAP.
Maximum cable length: 100 meters.
Figure 7-16 Install AP300/AP400 Base Station