Issue 3.0
SV9100 System Hardware Manual 3-13
9. Close the GPZ-BS10 cover.
3.3.2.3 Install the GPZ-BS11 Expansion Blade in the
CHS2UG-US Expansion Chassis
Figure 3-11 GPZ-BS10 Blade Installed
Figure 3-12 GPZ-BS10 Installed (Cover Closed)
Figure 3-13 GPZ-BS11 Components
For the Expansion Chassis to function, the
GPZ-BS10 blade must be installed in Controlling
Chassis.