EasyManua.ls Logo

NEC Univerge SV9100 - Figure 3-148 Removing the Fuse

NEC Univerge SV9100
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 3.0
SV9100 System Hardware Manual 3-111
4. Remove and replace the fuse as needed.
5. Reconnect battery cables a and b to connectors A and B.
6. To replace the battery, refer to section 8.3.1 CHS2UG B SMALL BATT
BOX Installation on page 3-104.
8.4 Installing the External Batteries (CHSG LARGE BATT BOX) to the
9.5” Gateway (CHS2UG GW-US) or Base (CHS2UG B-US) Chassis
An optional, CHSG LARGE BATT BOX can be installed to provide external battery
power to the CHS2UG GW-US chassis during a power failure. The long-term
battery box powers the system for approximately three hours.
8.4.1 CHSG LARGE BATT BOX Installation
To install the batteries in the CHSG LARGE BATT BOX, refer to Chapter 3,
section 8.2.2 Battery Installation on page 3-94.
Figure 3-148 Removing the Fuse
WARNING
Because of injury from falling equipment, wall mounting the
CHSG LARGE BATT BOX is not recommended.
Mounting the CHSG LARGE BATT BOX directly on the floor is
not recommended.
Due to possible water damage, floor mounting the 9.5” chassis is
not recommended by NEC.
NOTE
The CHS BASE UNIT raises the height of the CHSG LARGE BATT
BOX 120mm (4.72”).

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals