EasyManua.ls Logo

NEC Univerge SV9100 - Figure 5-64 Ribbon Cable Installed; Figure 5-65 8 LKD (LD)-L UNIT Installed

NEC Univerge SV9100
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 3.0
5-66 Installing DT Series Digital and IP Multiline Terminals
7. Plug ribbon cable on back of 8LKD (LD)-L UNIT into
connector until pressure is felt.
8. Press down on the black bar to lock the cable into place
(refer to Figure 5-64 Ribbon Cable Installed on page 5-66).
9. Align the projections on the bottom of the 8LKD (LD)-L UNIT
with the guide holes on top of the multiline terminal.
10. Slide the 8LKD (LD)-L UNIT toward the keypad buttons until
snug (refer to Figure 5-65 8LKD (LD)-L UNIT Installed).
Figure 5-64 Ribbon Cable Installed
Projection
(One Each Side)
Guide
Guide
Figure 5-65 8LKD (LD)-L UNIT Installed

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals