EasyManua.ls Logo

NEC Univerge SV9100 - Figure 3-131 Install the Fan Access Panel; Figure 3-132 Removing CHSG LARGE BATT BOX Cover

NEC Univerge SV9100
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 3.0
SV9100 System Hardware Manual 3-101
6. Insert the access panel tab into the rear of the CHS2UG-US chassis
running the Battery Connection Cable through the cutout. Secure
panel with the retaining screw.
7. Connect grounding and AC power cables.
8. Apply power to chassis (refer to Chapter 4, 2.6 Powering Up the
SV9100 System on page 4-9).
8.2.4 CHSG LARGE BATT BOX Fuse Replacement
1. Loosen screw on front of CHSG LARGE BATT BOX.
Figure 3-131 Install the Fan Access Panel
Figure 3-132 Removing CHSG LARGE BATT BOX Cover

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals