EasyManua.ls Logo

NEC Univerge SV9100 - Figure 3-149 9.5 Chassis (Rear View)

NEC Univerge SV9100
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 3.0
3-112 Installing the SV9100 Chassis
8.4.2 CHSG LARGE BATT BOX to 9.5” Gateway (CHS2UG GW-US) or
Base (CHS2UG B-US) Chassis Connection
1. Power down the CHS2UG GW-US or CHS2UG B-US chassis.
2. Disconnect AC power cable from rear of chassis.
3. From the back of the 9.5” chassis, remove the black plastic square
covering the two-prong battery terminal leads (refer to Figure 3-149
9.5” Chassis (Rear View)).
4. Connect one end of Battery Connection Cable to Battery Connector
on rear of 9.5” chassis.
5. Connect other end of cable to Battery Connector on rear of CHSG
LARGE BATT BOX chassis (refer to Figure 3-150 CHSG LARGE
BATT BOX to CHS2UG GW-US or CHS2UG B-US Connection on
page 3-113).
WARNING
Ensure the CHS2UG GW-US or CHS2UG B-US chassis
is powered OFF.
Figure 3-149 9.5” Chassis (Rear View)
Ground
AC Inlet
For External Battery
(12V Connection)
CHS2UG

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals