EasyManua.ls Logo

Avaya S8100 Series - Prerequisites; Tasks checklists; Presite Checklist

Avaya S8100 Series
1262 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Migration paths
Issue 2.1 June 2006 325
Prerequisites
You must complete the following tasks before you start the migration:
Presite Checklist on page 325 - Perform these tasks before you go on site.
Additional tasks on page 327 - Perform these tasks before you start the migration from an
existing DEFINITY system.
Presite migration checklist on page 329 - Perform these tasks before you go on site.
On site migration checklist on page 329 - Perform these tasks on site before you start the
migration.
Documentation checklist for migrations on page 331 - Have these documents ready to use
while you perform the migration.
Tasks checklists
Presite Checklist
Before you go on site, perform the following tasks
:
9
Task Description
Verify that your Services
laptop has the appropriate
hardware.
Correct hardware components include:
40 MB available disk space
direct Ethernet cable
serial cable and adapter
RS-232 port connector
Network interface card (NIC) with a 10/100
BaseT Ethernet interface
10/100 BaseT Ethernet, category 5, or better,
crossconnect cable with an RJ45 connector on
each end, MDI to MDI-X
CD-ROM drive
Verify that your Services
laptop has the appropriate
software.
Correct software components include:
Windows 2000/XP operating system
Terminal emulation program: HyperTerminal or
other
TCP/IP networking software: bundled with
Windows OS
Web browser: Internet Explorer 5.0 or later
1 of 3

Table of Contents

Related product manuals