Premigration administration
Issue 2.1 June 2006 525
Post-migration administration:
● Accessing the server command line interface with SSH protocol on page 536
● Using static addressing on page 538
● Clearing the ARP cache on the laptop computer on page 538
● Logging in to the IPSI on page 539
● Setting the control interface on page 539
● Setting the VLAN and diffserv parameters on page 541
● Resetting the IPSI on page 541
● Verifying IPSI translations on page 542
● Verifying IPSI connectivity on page 543
● Enabling control of the IPSI on page 543
● Verifying the customer data on page 543
● Verifying circuit pack locations on page 544
● Verifying circuit pack insertion on page 544
● Verifying the IP addresses on page 544
● Checking the link status on page 545
● Upgrading firmware on page 545
● Testing the installation on page 546
● Busying out previously busied out trunks on page 546
● Troubleshooting the migration on page 546
● Returning replaced equipment on page 546
Premigration administration
This migration affects service because you must turn of the PPN to replace the carrier. Before
you turn off the cabinet, you must perform the following premigration administration.
!
CAUTION:
CAUTION: The licensing of the platform and port network connectivity attributes for the
S8700-Series Media Server can be complex. See Caution about platform/PNC
license settings for the S8700-series Media Server on page 314 and License and
Avaya authentication files on page 313.