Migration paths
Issue 2.1 June 2006 585
When you are on site for a migration from a DEFINITY system, complete the following
additional tasks before you start the migration:
Documentation checklist for migrations
For a list of documents that Avaya recommends you have on hand for the migration, see
Resources
on page 54.
9
Task Description
Verify the customer supplies
an EIA 310D (or equivalent)
standard 4-post, 19-inch
(48-centimeter), equipment
rack.
Verify that this rack is
installed correctly and
solidly secured.
Ensure that you have the screws that come with the
rack. Ensure that the rail kit for the Avaya-supplied
UPS is installed on the rack or available for
installation. For information on how to install the rail,
see the rail kit documentation.
Verify that you have the
license file that the license
file includes:
● the right to use (RTU)
feature
● the applicable
hardware parts in the
existing system
● any hardware that is
being added as part
of the migration
Use the License File link on the Maintenance Web
Interface to verify.
Verify that you have the
Avaya authentication file.
Use the License File link on the Maintenance Web
Interface to verify.
Replace the TN795 or the
TN2314 Processor circuit
pack that contains the Audix
feature.
Replace with a TN2312BP Internet Protocol Server
Interface (IPSI) circuit pack that does not have the
Audix feature. You also must return the existing
Processor circuit pack to Avaya.