EasyManua.ls Logo

Avaya S8100 Series - On site migration checklist

Avaya S8100 Series
1262 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Migrating an Avaya IP600/S8100 to an S8500 Media Server
584 Upgrading, Migrating, and Converting Media Servers and Gateways
On site migration checklist
When you are on site for a migration from a DEFINITY system, complete the following
additional tasks before you start the migration:
9
Task Description
The customer supplies an
open EIA 310D (or
equivalent) standard 4-post,
19-inch (48-centimeter),
equipment rack. Verify that
this rack is installed
correctly.
Ensure that you have the screws that come with the
rack. Ensure that the rail kit for the Avaya-supplied
UPS is installed on the rack or available for
installation. For more information on how to install the
rail, see the documentation that comes with the rail kit.
Verify that you have the
license file that the file
includes the licensed
features.
Use the License File link on the Maintenance Web
Interface to verify.
Verify that you have the
Avaya authentication file.
Use the License File link on the Maintenance Web
Interface to verify.

Table of Contents

Related product manuals