Migrating from an S8700 Media Server to an S8710 Media Server
896 Upgrading, Migrating, and Converting Media Servers and Gateways
Before you go on site for a migration from a DEFINITY system, complete the following
additional tasks before starting the migration:
On site migration checklist
When you are on site, complete the following tasks before you start the migration:
9
Task Description
You might need to move the
UPSs and the Ethernet
switch(es) from the 2-post
rack to the 4-post rack.
Ensure that you have:
● A Philips screwdriver
● Rail kits (700230741) for a 4-post rack for the
UPSs
● Cage nuts to attach the screws to the rack, if
necessary
● At least 2 people to lift the equipment
9
Task Description
Verify that the EIA 310D
19-inch (48-cm) open
equipment rack is grounded.
See the job aid titled Approved Grounds
(555-245-772).
For S8710 only:
Verify that the open,
customer-supplied, EIA
310D (or equivalent)
standard 4-post, 19-inch
(48-centimeter), equipment
rack is properly installed
and solidly secured.
Ensure that you have the screws that come with the
rack. Ensure that the rail kit for the Avaya-supplied
UPS is installed on the rack or available for
installation. For more information on installing the rail,
see the rail kit documentation.
1 of 2