Migration paths
Issue 2.1 June 2006 627
When you are on site for a migration from a DEFINITY system, complete the following
additional tasks before you start the migration:
Documentation checklist for migrations
For a list of documents that Avaya recommends you have on hand for the migration, see
Resources
on page 54.
9
Task Description
The customer supplies an
open EIA 310D (or
equivalent) standard 4-post,
19-inch (48-centimeter),
equipment rack. Verify that
this rack is installed
correctly and solidly
secured.
Ensure that you have the screws that come with the
rack for installing in square holes or with adapters.
Ensure that the rail kit for the Avaya-supplied UPS is
installed on the rack or available for installation. For
more information on how to install the rail, see the rail
kit documentation.
Verify that cables for the
TN2312BP Internet Protocol
Server Interface (IPSI)
circuit packs are labeled
and that appropriate
connectivity is provided.
The cables for TN2312BP Internet Protocol Server
Interface (IPSI) circuit packs run from the control
hardware rack to the port networks.
Verify that you have the
license file and that these
files include the licensed
features.
Verify that you have the
Avaya authentication file.
9
Document Description
Quick Start for Hardware
Installation: Avaya
S8700-Series Media
Servers (555-245-703)
A quick reference guide that provides physical
installation and connection information.
Administration for Network
Connectivity for Avaya
Communication Manager
(555-233-504)
Provides information on network connectivity.