Premigration administration
Issue 2.1 June 2006 333
● Resetting the SIPI on page 349
● Enabling control of the SIPI on page 350
● Verifying SIPI translations on page 350
● Verifying SIPI connectivity on page 351
● Verifying the customer data on page 351
● Verifying circuit pack locations on page 351
● Verifying circuit pack insertion on page 352
● Verifying the IP addresses on page 352
● Checking the link status on page 352
● Upgrading firmware on page 353
● Testing the installation on page 353
● Busying out previously busied out trunks on page 353
● Troubleshooting the migration on page 354
● Returning replaced equipment on page 354
Premigration administration
This migration is a service-affecting event. The CMCs must be turned off to replace the
processor and tone clock circuit packs. Before you turn off the cabinets, you must perform the
following premigration administration.
Accessing Remote Feature Activation
Use this section for information on how to access Remote Feature Activation (RFA).
You can access the RFA information page for these items (if not already installed on your PC):
Note:
Note: For Release 10 and later, do not use the FET because the license contains the
existing switch configuration information. For Releases G3v4 and earlier, do not
use the FET because the ASD tool and process captures the existing switch
configuration information.