EasyManua.ls Logo

Avaya S8100 Series - Page 709

Avaya S8100 Series
1262 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Migration paths
Issue 2.1 June 2006 709
9
Task Description
Verify that the open,
customer-supplied, EIA
310D (or equivalent)
standard, 19-inch
(48-centimeter), equipment
rack is properly installed
and solidly secured.
Ensure that the screws that come with the rack are
there (for installing in square holes or with adapters).
Ensure that the rail kit for the Avaya-supplied UPS is
installed on the rack or available for installation. For
more information on installing the rail, see the
documentation that comes with the rail kit.
Verify that cable for the
TN2312BP Internet Protocol
Server Interface (IPSI)
circuit packs is labeled and
that appropriate connectivity
is provided.
The TN2312BP Internet Protocol Server Interface
(IPSI) circuit packs runs from the control hardware
rack to the port networks.
Verify that you have the
license file that it includes
the licensed features.
Verify that you have the
Avaya authentication file.

Table of Contents

Related product manuals