EasyManua.ls Logo

Avaya S8100 Series - Page 753

Avaya S8100 Series
1262 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Prerequisites
Issue 2.1 June 2006 753
When you are on site for a migration from a DEFINITY system, complete the following
additional tasks before starting the migration:
9
Task Description
The customer supplies an
EIA 310D (or equivalent)
standard, 19-inch
(48-centimeter), equipment
rack.
Verify that this rack is
installed correctly.
Ensure that you have the screws that come with the
rack for installing in square holes or with adapters.
Ensure that the rail kit for the Avaya-supplied UPS is
installed on the rack or available for installation. For
more information on how to install the rail, see the
documentation that comes with the rail kit.
Verify that cables for the
TN2312BP Internet Protocol
Server Interface (IPSI)
circuit packs are labeled
and that appropriate
connectivity is provided.
The TN2312BP Internet Protocol Server Interface
(IPSI) circuit packs runs from the control hardware
rack to the port networks.
Verify that you have the
license file from RFA and
that the file includes the
licensed features.
Verify that you have the
Avaya authentication file
from RFA.
Verify that you have the
required tools on site.
For instructions on how to transfer translations using
the Magneto Optical Server Tool, see Transferring
translations on page 766.

Table of Contents

Related product manuals