Migrating a DEFINITY ONE/S8100 to an S8700-Series Media Server with IP-PNC
808 Upgrading, Migrating, and Converting Media Servers and Gateways
When you are on site for a migration from a DEFINITY system, complete the following
additional tasks before you start the migration:
Verify that you have the
correct cables for the
TN2312BP Internet Protocol
Server Interface (IPSI)
circuit packs.
The cables must be labeled and run from the control
hardware rack to the port networks. Appropriate
connectivity must be provided.
Verify that you have all
necessary equipment
onsite.
For the list of required hardware, see:
● Installing and Configuring the Avaya S8500
Media Server (03-300143)
● Installing and Configuring the Avaya
S8700-Series Media Server (03-300145)
9
Task Description
S8710:
The customer supplies an
open, EIA 310D (or
equivalent) standard
four-post, 19-inch
(48-centimeter), equipment
rack.
Verify that this rack is
installed correctly.
Ensure that you have the screws that come with the
rack. Ensure that the rail kit for the Avaya-supplied
UPS is installed on the rack or available for
installation. For more information on how to install the
rail, see the documentation that comes with the rail kit.
You might need to move
the UPSs and Ethernet
switches from the two-post
rack.
Ensure that you have:
● A Phillips screwdriver
● Rail kits for a four-post rack for the UPSs
● Cage nuts to attach the screws to the rack, if
necessary
● At least 2 people to lift the equipment
9
Task Description
2 of 2