Migrating a DEFINITY Server R to an S8700-Series Media Server
756 Upgrading, Migrating, and Converting Media Servers and Gateways
● Upgrading and administering the existing hardware on page 776
● Connecting the media server cables and the IPSI cables to the Ethernet switch on
page 777
● Upgrading the hardware in each port network on page 777
● Duplex reliability configuration on page 779
● High-reliability or critical-reliability configuration on page 782
● Connecting the CAT5 cables to the IPSI circuit packs on page 785
● Installing Expansion Interface circuit packs on page 785
● Completing circuit pack replacement on page 785
● Verifying hardware on page 786
● Removing the processor port network control carrier(s) on page 786
● Installing the expansion control carrier and the port carrier on page 787
● Installing IPSI and maintenance circuit packs on page 788
● Connecting the CAT5 cables to the IPSI circuit packs on page 788
● Installing Expansion Interface circuit packs on page 788
● Turning on the media gateway on page 789
Post-migration administration:
● Accessing the server command line interface with SSH protocol on page 789
● Using DHCP addressing on page 791
● Administering the location assignment on page 791
● Setting the switch ID on page 792
● Setting the cabinet number on page 793
● Verifying IPSI translations on page 793
● Verifying IPSI connectivity on page 794
● Enabling control of the IPSI on page 794
● Verifying the customer data on page 795
● Verifying circuit pack locations on page 795
● Verifying circuit pack insertion on page 795
● Verifying the IP addresses on page 795
● Checking the link status on page 796
● Upgrading firmware on page 796
● Testing the installation on page 797