EasyManua.ls Logo

R&S ZNB Series - Page 1462

R&S ZNB Series
1611 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Command reference
R&S
®
ZNB/ZNBT
1462User Manual 1173.9163.02 ─ 62
DIAGnostic:SERVice:CALibration:DATE <CalibrationDate>
Defines last date and time the instrument was calibrated in ISO 8601 format.
Parameters:
<CalibrationDate> String containing calibration date of the instrument.
Example: //Set calibration date
DIAG:SERV:CAL:DATE "2019-05-05T00:00:00Z"
Manual operation: See "Last Calibration" on page 771
DIAGnostic:SERVice:CALibration:DUE:DATE <DueDate>
Defines next date and time the instrument needs calibration to be done in ISO 8601
format. The response may be empty in case of no fixed next calibration due.
Parameters:
<DueDate> String containing next calibration due date.
An empty string resets the date (= no due date).
Example: //Set calibration due date
DIAG:SERV:CAL:DUE:DATE "2020-05-12T00:00:00Z"
Manual operation: See "Next Calibration Due" on page 770
DIAGnostic:SERVice:CALibration:DUE:STATe?
Queries the state if the calibration is OK or the instrument requires calibration.
Return values:
<State> NAN
Not a number, e.g. if no due date is set.
OK
Calibration is OK since due date has not expired yet.
EXPired
Calibration due date has expired. Calibration is needed.
Example: //Return calibration due state
DIAG:SERV:CAL:DUE:STAT?
Usage: Query only
DIAGnostic:SERVice:CALibration:INTerval? <Duration>
Queries the recommended calibration interval, set by Rohde & Schwarz service.
Parameters:
<Duration> String indicating the calibration interval (ISO 8601 duration)
Example:
DIAG:SERV:CAL:INT?
returns "P1Y" if the recommended calibration interval is 1 year
Usage: Query only
HUMS and service date commands

Table of Contents

Related product manuals