EasyManua.ls Logo

R&S ZNB Series - Step 2: Connections

R&S ZNB Series
1611 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GUI reference
R&S
®
ZNB/ZNBT
487User Manual 1173.9163.02 ─ 62
Step 2: Connections
Defines the port assignments between the R&S ZNB/ZNBT and the calibration unit.
Figure 5-30: SMARTerCal (Cal Unit), Step 2: Connections (single)
Figure 5-31: SMARTerCal (Cal Unit), Step 2: Connections
Related information
Refer to Chapter 4.5.5.6, "Multiple port assignments", on page 191 for details on multi-
ple port assignments.
Port Assignment (manual)
The "Connections" step allows you to configure the assignments between VNA ports
and calibration unit ports manually.
Cal softtool

Table of Contents

Related product manuals