GUI reference
R&S
®
ZNB/ZNBT
487User Manual 1173.9163.02 ─ 62
Step 2: Connections
Defines the port assignments between the R&S ZNB/ZNBT and the calibration unit.
Figure 5-30: SMARTerCal (Cal Unit), Step 2: Connections (single)
Figure 5-31: SMARTerCal (Cal Unit), Step 2: Connections
Related information
Refer to Chapter 4.5.5.6, "Multiple port assignments", on page 191 for details on multi-
ple port assignments.
Port Assignment (manual)
The "Connections" step allows you to configure the assignments between VNA ports
and calibration unit ports manually.
Cal softtool