EasyManua.ls Logo

R&S ZNB Series - Page 490

R&S ZNB Series
1611 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GUI reference
R&S
®
ZNB/ZNBT
490User Manual 1173.9163.02 ─ 62
Use "Next"/"Prev" to navigate between the calibration substeps.
Start Cal Sweep / Abort Sweep
Starts the necessary calibration sweeps or aborts them.
Note: The power calibration sweep is performed at the "Reference Receiver Cal
Power" level specified in the Modify Cal Power dialog.
A subsweep is performed for every required test port (pair), for every possible path (if
external switch matrices are involved) and - during system error correction - for every
required standard.
Remote command:
[SENSe<Ch>:]CORRection:COLLect:AUTO
[SENSe<Ch>:]CORRection:COLLect:AUTO:TYPE
[SENSe<Ch>:]CORRection:COLLect:AUTO:PORTs
[SENSe<Ch>:]CORRection:COLLect:AUTO:PORTs:TYPE
[SENSe<Ch>:]CORRection:COLLect:AUTO:ASSignment<Asg>:ACQuire
[SENSe<Ch>:]CORRection:COLLect:AUTO:POWer
Detect Ports & Start Cal
Performs the "Detect Port Assignment" and "Start Cal Sweep" functions, one after the
other.
Detect Port Assignment
Starts a procedure by which the R&S ZNB/ZNBT (with a little help from the attached
calibration unit) auto-detects the connected ports. The automatic assignment replaces
the configured one.
In case auto-detection fails
an error report is shown as a warning dialog
the undetected port connections are marked with warning signs
the calibration can be invalid
Cal softtool

Table of Contents

Related product manuals