EasyManua.ls Logo

R&S ZNB Series - Page 1093

R&S ZNB Series
1611 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Command reference
R&S
®
ZNB/ZNBT
1093User Manual 1173.9163.02 ─ 62
Manual operation: See "Set" on page 555
CONTrol<Ch>:RFFE:TEST:SENSe:TRIGger
Starts the voltage/current measurements on all RFFE pins.
The measurement time can be defined using CONTrol<Ch>:RFFE:TEST:TIME.
Suffix:
<Ch>
.
Channel number
This suffix is ignored and can be omitted.
Usage: Event
Options: R&S ZN-B15/Z15 Var. 03
Manual operation: See "Start Meas" on page 556
CONTrol<Ch>:RFFE:TEST:TIME <MeasTime>
Sets the measurement time for the voltage/current measurements on the RFFE and
GPIO pins.
Same functionality as CONTrol<Ch>:GPIO:TIME.
Suffix:
<Ch>
.
Channel number
This suffix is ignored and can be omitted: the measurement time
is valid for all channels.
Parameters:
<MeasTime> Measurement (= sampling = averaging) time
Range: 95 μs to 100 ms
*RST: 100 ms
Default unit: s
Options: R&S ZN-B15/Z15 Var. 03
Manual operation: See "Start Meas" on page 556
CONTrol<Ch>:SEGMent<Nr>:DELay <Delay>
For segmented sweeps this command allows to introduce delays between subsequent
sequence steps and between the final sequence step and the sweep (segment) start.
The command/switch sequences are defined using CONTrol<Ch>:SEGMent<Nr>:
RFFE<Bus>:COMMand:DATA and CONTrol<Ch>:SEGMent<Nr>:GPIO<Port>:
VOLTage.
Suffix:
<Ch>
.
Channel number
<Nr> Segment number
SCPI command reference

Table of Contents

Related product manuals