EasyManua.ls Logo

ETC Cobalt 10 - Installation Guidelines

ETC Cobalt 10
1076 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cobalt 8.1 - 20181029
49
Installation guidelines
Equipment required to run this system
Cobalt20, Cobalt10, Cobalt Nomad, Net3 RVI, Client software
Power cables
Up to three external DVI multi touch monitors.
DMX512 or Ethernet cable(s) to external equipment
Connect the monitor signal cable(s) from the back of the console to the monitor(s), and then connect
the power cables to a 230/110V outlet and start all units. After approximately 30 seconds Cobalt
should be running.
See Power-up Procedure
.

Table of Contents

Related product manuals