EasyManua.ls Logo

Bizerba GLM-I - Operation; Switch on Device; Switching off Device

Bizerba GLM-I
505 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Instruction manual GLM-I
334 38.019.129.001 en
24
24 Operation
24.1 Switch on device
Switch on the device at least 20 minutes before starting production. It
takes this amount of time for the scales to reach the correct operating
temperature. If production is started earlier
, the precision of the weigh-
ing process might be affected.
If switching off device briefly, wait at least 10 seconds before switching
it on again to make sure that the device is switched off completely
.
1
Main switch (rotary switch)
2
Main switch (push-button)
3
System reboot push-button
Illustration 65: GLM-I main switch
Prerequisites:
The device has been installed properly and connected.
The operating requirements are fulfilled.
The weighing belt is empty.
Press the main switch or turn clockwise.
The main menu appears after a few seconds.
Wait 20 minutes until you start production.
24.2 Switching off device
Frequent breaks where the device is switched off can affect the preci-
sion of the weighing process
. Leave the device switched on during short
breaks in production. Do not switch off the device until production is
over.
Press <Stop>.
Press main switch or turn counterclockwise.

Table of Contents

Related product manuals