Maintenance Instruction manual GLM-I
390 38.019.129.001 en
28
Activity Interval Cleaning agent/
lubricant
Rotary arm labeler Labeling chute: Spray soiling
with sufficient label remover
.
Leave it to soak in well and re-
move the label residues by
hand or with a cloth.
0.5 days Label remover,
95943000000
Clean and lubricate roller
track.
0.5 days Label remover,
95943000000
Oil, 96001740000
Rotary arm labeler Replace rotary arm labeler. 2 weeks –
Piston labeler Clean suction plate, gripper. Daily Label remover,
95943000000
Turn suction piston. 2 weeks –
Belt labeler Replace pressure roller. 4 weeks –
Clean deflecting plate, suction
plate, gripper.
0.5 days Label remover,
95943000000
Belt labeler Clean jet. If dirty Label remover,
95943000000
Belt modules
Activity Interval Cleaning agent/lu-
bricant
Clean, replace belt. After soiling/wear
and tear
Water with standard
cleaning agents
Papst-Zeitlauf, Maxon: Replace motors. 1.25 years –
Check conveyor rollers and replace, if nec-
essary.
With each belt re-
placement
–
Clean belt bodies: With each belt re-
placement
Brush and label re-
mover, 95943000000