EasyManua.ls Logo

Cisco ONS 15454 DWDM - NTP- G14 Install DWDM Equipment

Cisco ONS 15454 DWDM
1218 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-66
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
August 2005
Chapter 1 Install the Shelf and Common Control Cards
NTP-G14 Install DWDM Equipment
NTP-G14 Install DWDM Equipment
Step 1 Complete the “DLP-G27 Install the DCU Shelf Assembly” task on page 1-67 as needed.
Step 2 Complete the “DLP-G28 Install the Fiber Patch-Panel Tray” task on page 1-67 as needed.
Step 3 Complete the “DLP-G29 Install the Fiber-Storage Tray” task on page 1-68 as needed.
Step 4 Complete the “DLP-G8 Install the Air Ramp” task on page 1-19 as needed.
Step 5 Complete the “DLP-G30 Install the FlexLayer Shelf” task on page 1-68 as needed.
Note Procedures for installing FlexLayer hardware in this chapter require that you have a network
plan calculated for your DWDM network with Cisco MetroPlanner, Release 2.5. MetroPlanner
is a DWDM planning tool that is available your Cisco account representative. MetroPlanner
prepares a shelf plan for each network node and calculates the power and attenuation levels for
the DWDM cards installed in the node. For information about Cisco MetroPlanner, refer to the
Cisco MetroPlanner DWDM Operations Guide, Release 2.5.
Step 6 Complete the “DLP-G31 Install the FlexLayer Modules” task on page 1-69 as needed.
Step 7 Complete the “DLP-G32 Install the Y-Cable Protection Modules” task on page 1-70 as needed.
Stop. You have completed this procedure.
Purpose This procedure installs the optional DWDM assemblies.
Tools/Equipment #2 Phillips screwdriver
Crimping tool (large enough for #10 to #14 AWG)
#14 AWG wire
Prerequisite Procedures NTP-G2 Install the Shelf Assembly, page 1-8
Required/As Needed As needed
Onsite/Remote Onsite
Security Level None

Table of Contents

Other manuals for Cisco ONS 15454 DWDM

Related product manuals