4-48
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 4 Perform Node Acceptance Tests
DLP-G271 Verify the AD-xC-xx.x Output Common Power
DLP-G271 Verify the AD-xC-xx.x Output Common Power
Step 1 Display the AD-xC-xx.x card in card view.
Step 2 Click the Provisioning > Optical Line > Parameters tabs.
Step 3 Verify that the Output Com port Power value is greater than the default no-power value of –30 dBm.
Step 4 Return to your originating procedure (NTP).
DLP-G272 Verify the AD-xB-xx.x Output Common Power
Step 1 Display the AD-xB-xx.x card in card view.
Step 2 Click the Provisioning > Optical Line > Parameters tabs.
Step 3 Verify that the Output Com port Power value is greater than the default no-power value of –28 dBm.
Step 4 Return to your originating procedure (NTP).
Purpose This task verifies the output common power of the AD-xC-xx.x cards.
Tools/Equipment None
Prerequisite Procedures DLP-G46 Log into CTC, page 2-25
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Superuser
Purpose This task verifies the output common power of the AD-xB-xx.x cards.
Tools/Equipment None
Prerequisite Procedures DLP-G46 Log into CTC, page 2-25
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Superuser