EasyManua.ls Logo

Cisco ONS 15454 DWDM - DLP- G68 Install Fiber-Optic Cables for a Line Amplifier Node

Cisco ONS 15454 DWDM
1218 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-58
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 3 Turn Up a Node
DLP-G68 Install Fiber-Optic Cables for a Line Amplifier Node
DLP-G68 Install Fiber-Optic Cables for a Line Amplifier Node
Note Throughout this task, west refers to Slots 1 through 8, and east refers to Slots 10 through 17.
Step 1 Refer to the Cisco MetroPlanner Internal Connections table (see Table 3-1 on page 3-3) for your site
when completing connections. Before you begin the line amplifier node connections, read the following
rules:
Line amplifier node layout allows all combinations of OPT-PRE and OPT-BST and allows you to
use asymmetrical card choices in west-to-east and east-to-west configurations. For a given line
direction, you can configure the four following possibilities:
Only preamplification (OPT-PRE)
Only booster amplification (OPT-BST)
Both preamplification and booster amplification (where a line amplifier node has amplification
in at least one direction)
Neither preamplification nor booster amplification
If a west OPT-PRE card is installed:
The west OSC-CSM or OPT-BST COM TX is connected to the west OPT-PRE COM RX port.
The west OPT-PRE COM TX port is connected to the east OSC-CSM or OPT-BST COM RX
port.
If a west OPT-PRE card is not installed, the west OSC-CSM or the OPT-BST COM TX port is
connected to the east OSC-CSM or OPT-BST COM RX port.
If an east OPT-PRE card is installed:
The east OSC-CSM or OPT-BST COM TX port is connected to the east OPT-PRE COM RX
port.
The east OPT-PRE COM TX port is connected to the west OSC-CSM or OPT-BST COM RX
port.
If an east OPT-PRE card is not installed, the east OSC-CSM or OPT-BST COM TX port is connected
to the west OSC-CSM or OPT-BST COM RX port.
Figure 3-12 shows an example of a line amplifier node with cabling.
Note Figure 3-12 is an example. Always install fiber-optic cables based on the Cisco MetroPlanner
Internal Connections table for your site.
Purpose This task installs fiber-optic cables on a line amplifier node in a DWDM
shelf.
Too ls Fiber-optic cables
Prerequisite Procedures NTP-G115 Clean Fiber Connectors, page 13-25
NTP-G139 Verify Cisco MetroPlanner Reports and Files, page 3-3
Required/As Needed As needed
Onsite/Remote Onsite
Security Level None

Table of Contents

Other manuals for Cisco ONS 15454 DWDM

Related product manuals