4-52
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 4      Perform Node Acceptance Tests
DLP-G92 Verify 4MD-xx.x Pass-Through Connection Power
d. Verify that the Power value of the CHAN RX port reaches the provisioned setpoint (VOA Power 
Ref).
Step 4 Return to your originating procedure (NTP).
DLP-G92 Verify 4MD-xx.x Pass-Through Connection Power
Step 1 Verify the TX band power on the related east AD-xB-xx.x card: 
a. Display the east AD-xB-xx.x card in card view. 
b. Click the Provisioning > Optical Band > Parameters tabs. 
c. Change the Admin State of the BAND TX port to OOS,MT (ANSI) or Locked,maintenance 
(ETSI) for the channel related to the wavelength selected on the tunable laser.
d. Verify that the BAND TX Power value is higher than the default no-power value of –30 dBm.
Step 2 Verify the TX power on the related east 4MD-xx.x (east-to-west) card:
a. Display the east 4MD-xx.x card in card view.
b. Click the Provisioning > Optical Chn > Parameters tabs.
c. Verify that the Power value on the CHAN TX port is higher than the default no-power value of 
–35 dBm.
Step 3 Verify the RX band power on the west AD-xB-xx.x card (east-to-west):
a. Display the west Ad-xB-xx.x card in card view.
b. Click the Provisioning > Optical Band > Parameters tabs.
c. Verify that the BAND RX Power value is higher than the default no-power values of –30 dBm.
Step 4 Verify the west 4MD-xx.x (east-to-west):
a. Display the west 4MD-xx.x card in card view.
b. Click the Provisioning > Optical Chn > Parameters tabs.
c. Change the Admin State of the CHAN RX port to OOS,MT (ANSI) or Locked,maintenance 
(ETSI) for the channel related to the wavelength selected on the tunable laser.
d. Verify that the Power value of the CHAN RX port reaches the provisioned setpoint (VOA Power 
Ref).
Step 5 Verify the TX band power on the west AD-xB-xx.x (west-to-east):
a. Display the west AD-xB-xx.x card in card view.
b. Click the Provisioning > Optical Band > Parameters tabs.
Purpose This task verifies 4MD-xx.x pass-through connection. 
Tools/Equipment None
Prerequisite Procedures DLP-G46 Log into CTC, page 2-25
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Superuser