EasyManua.ls Logo

Cisco ONS 15454 DWDM - DLP- G159 Refresh Automatic Power Control Information

Cisco ONS 15454 DWDM
1218 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10-5
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 10 Manage the Node
DLP-G159 Refresh Automatic Power Control Information
Step 4 Return to your originating procedure (NTP).
DLP-G159 Refresh Automatic Power Control Information
Step 1 In node view, click the Maintenance > DWDM > APC tabs.
Step 2 Click Refresh.
Step 3 Return to your originating procedure (NTP).
NTP-G78 View ROADM Node Power Equalization
Step 1 Complete the “DLP-G46 Log into CTC” task on page 2-25. If you are already logged in, continue with
Step 2.
Step 2 In node view, click the Maintenance > DWDM > ROADM Power Monitoring tabs.
Step 3 On the Power Monitoring tab, view the following east-to-west (E > W) and west-to-east (W > E) power
information:
Padd—Add power. This power level is represented by the red bar.
Ppt—Pass-through power. This power level is represented by the yellow bar.
Pout—Output power. This power level is represented by the blue bar. It shows the per-channel
(wavelength) power at the 32WSS output (COM_TX) port.
Purpose This task refreshes the DWDM APC information.
Tools/Equipment A node provisioning plan prepared by Cisco MetroPlanner is required.
Prerequisite Procedures All procedures in the following chapters:
Chapter 3, “Turn Up a Node”
Chapter 6, “Turn Up Network”
DLP-G46 Log into CTC, page 2-25
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Superuser
Purpose This procedure allows you to view ROADM node power equalization
levels.
Tools/Equipment None
Prerequisite Procedures DLP-G46 Log into CTC, page 2-25
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Superuser

Table of Contents

Other manuals for Cisco ONS 15454 DWDM

Related product manuals