FIGURES
xxix
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
August 2005
Figure 1-1 Reversing the Mounting Brackets (23-inch [584.2-mm] Position to 19-inch [482.6-mm] Position 1-11
Figure 1-2 Installing the External Brackets 1-12
Figure 1-3 Mounting an ONS 15454 ETSI in a Rack 1-14
Figure 1-4 Three-Shelf ONS 15454 ETSI (15454 SDH) Bay Assembly 1-18
Figure 1-5 Mounting the Air Ramp in a Rack 1-19
Figure 1-6 Cisco ONS 15454 ANSI Front Door 1-21
Figure 1-7 Removing the ONS 15454 ETSI Front Door 1-22
Figure 1-8 Removing the ONS 15454 ANSI Front Door 1-23
Figure 1-9 Unscrewing the FMEC Cover 1-24
Figure 1-10 Removing the ONS 15454 FMEC Cover 1-25
Figure 1-11 Backplane Covers on the 15454 ANSI Shelf 1-27
Figure 1-12 Installing FMECs on the ONS 15454 ETSI 1-29
Figure 1-13 Grounding the ONS 15454 ETSI 1-33
Figure 1-14 Ground Location on the Backplane 1-34
Figure 1-15 Cisco ONS 15454 Power Terminals 1-38
Figure 1-16 Installing the Fan-Tray Assembly on the ONS 15454 ETSI 1-42
Figure 1-17 Installing the Fan-Tray Assembly on the ONS 15454 ANSI 1-43
Figure 1-18 Replace Backplane Screws with Standoffs 1-45
Figure 1-19 Installing Standoffs and the AEP 1-46
Figure 1-20 AEP Wire-Wrap Connections to Backplane Pins 1-46
Figure 1-21 Cisco ONS 15454 Backplane Pinouts (Release 3.4 or Later) 1-54
Figure 1-22 Highlighted Environmental Alarms 1-55
Figure 1-23 Installing the AEP Cover 1-59
Figure 1-24 Alarm Input Connector 1-61
Figure 1-25 Alarm Output Connector 1-62
Figure 1-26 ONS 15454 ETSI FMEC Cover 1-63
Figure 1-27 Backplane Attachment for the Rear Cover 1-64
Figure 1-28 Installing the Rear Cover with Spacers 1-65
Figure 1-29 ONS 15xxx FlexLayer Shelf Assembly 1-70
Figure 2-1 Logging into CTC 2-26
Figure 2-2 Login Node Group 2-29