4-14
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 4 Perform Node Acceptance Tests
DLP-G310 Verify ROADM Node Pass-Through Channels
h. Display the east OSC-CSM card in card view, click the Provisioning > Optical Line > Parameters
tabs and read the Power value for Port 2, then continue with Step i.
i. Verify that the value in Step e, g, or h matches the power recorded in Step c, +/– 1.5 dB. If not, use
the “NTP-G115 Clean Fiber Connectors” procedure on page 13-25 to clean the fiber connection
between the 32WSS card and the OPT-PRE, OPT-BST, or OSC-CSM card.
Step 15 Verify the EXPRESS cable connection between the two 32WSS cards:
a. Display the east 32WSS in card view.
b. Click the Provisioning > Optical Line > Parameters tabs.
c. Locate the Port 65 Power parameter. Record the value.
a. Display the west 32WSS in card view.
b. Click the Provisioning > Optical Line > Parameters tabs.
c. Locate the Power value for Port 66. Verify that the value matches the power recorded in Step c,
+/–1 dB. If not, use the “NTP-G115 Clean Fiber Connectors” procedure on page 13-25 to clean the
fiber connection between the 32WSS cards.
Step 16 Display the west 32WSS card in card view.
Step 17 Click the Provisioning > Optical Chn Optical Connector [n] > Parameters tabs, where n = the
connector number containing the wavelength you are testing. Refer to Table 4-2 on page 4-9, if needed.
Step 18 Wait approximately 60 seconds, then locate the Power and VOA Power Ref parameters for the tested PT
port. Verify that the Power value is equal to the VOA Power Ref value, +/– 1.5 dBm.
Step 19 If an OPT-BST card is installed on the east side, complete the following steps. If not, continue with
Step 20.
a. Display the east OPT-BST in card view.
b. Click the Provisioning > Optical Line > Parameters tabs.
c. Locate the Port 1 Power parameter. Record the value.
d. Display the east 32WSS in card view.
e. Click the Provisioning > Optical Line > Parameters tabs.
f. Locate the Power value for Port 67. Verify that the value matches the power recorded in Step c,
+/–1 dB. If not, use the “NTP-G115 Clean Fiber Connectors” procedure on page 13-25 to clean the
fiber connection between the OPT-BST and 32WSS cards.
g. Complete the “DLP-G79 Verify the OPT-BST Amplifier Laser and Power” task on page 4-40.
Step 20 If a west OPT-PRE card is installed, complete the following steps. If not, continue with Step 14.
a. Display the west OPT-PRE in card view.
b. Click the Provisioning > Optical Line > Parameters tabs.
c. Locate the Power parameter for Port 1. Record the value.
d. Display the west OPT-BST or OSC-CSM card in card view.
e. Click the Provisioning > Optical Line > Parameters tabs.
f. Locate the Power value for Port 2 (if an OPT-BST) or Port 3 (if an OSC-CSM). Verify that the value
matches the power recorded in Step c, +/– 1.5 dB. If not, use the “NTP-G115 Clean Fiber
Connectors” procedure on page 13-25 to clean the fiber connection between the OPT-PRE card and
the OPT-BST or OSC-CSM card.
g. Complete the “DLP-G80 Verify the OPT-PRE Amplifier Laser and Power” task on page 4-41.