EasyManua.ls Logo

ABB AC500 PLC - 2.5.3.2 Mounting and Demounting of S500-eCo I;O Modules

ABB AC500 PLC
1315 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Remove the 2 screws.
2.5.3.2 Mounting and Demounting of S500-eCo I/O Modules
S500-eCo I/O-modules can be mounted either on a DIN rail or with screws on a metal plate.
NOTICE!
Risk of function faults!
The S500-eCo I/O modules are earthed via the DIN rail.
The DIN rail must be included into the earthing concept of the plant.
Use only metal screws.
Mounting I/O
Modules on a
DIN Rail
System Assembly, Construction and Connection
AC500-eCo > Mounting and Demounting
2019/04/17 3ADR010121, 13, en_US 1203

Table of Contents

Related product manuals