EasyManua.ls Logo

ABB AC500 PLC - Possibilities of Connection

ABB AC500 PLC
1315 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Terminal 4.8: process supply voltage UP3 = +24 VDC
Terminals 2.9, 3.9 and 4.9: process supply voltage ZP = 0 V
For a detailed description of the mounting, disassembly and electrical connec-
tion of the module, please refer to the System Assembly, Construction and Con-
nection chapter
Ä
Chapter 2.6 “AC500 (Standard)” on page 1248.
With a separate UP3 power supply, the digital outputs can be switched off exter-
nally. This way, an emergency-off functionality can be realized.
Possibilities of Connection
The assignment of the 9-pin female D-sub connector for the CANopen signals
1
5
6
9
1 --- Reserved
2 CAN- Inverted signal of the CAN Bus
3 CAN_GND Ground potential of the CAN bus
4 --- Reserved
5 --- Reserved
6 --- Reserved
7 CAN+ Non-inverted signal of the CAN Bus
8 --- Reserved
9 --- Reserved
Shield Cable shield Functional earth
The ends of the data lines have to be terminated with a 120 W bus terminating resistor. The bus
terminating resistor is usually installed directly at the bus connector.
1
2
4
3
1
2
4
3
1
2
4
3
6 6 6
120
120
Node 1 Node 2 Node N
5 5
Fig. 130: CANopen interface, bus terminating resistors connected to the line ends
Mounting on
Terminal Units
TU509 or TU510
Bus Terminating
Resistors
Device Specifications
Communication Interface Modules (S500) > CANopen
2019/04/17 3ADR010121, 13, en_US 741

Table of Contents

Related product manuals