NTP-A24 Verify Card Installation
Step 8 If Ethernet cards are installed, verify that the correct cross-connect cards are installed in Slots 8 and 10:
• E100T-12-G, E1000-2-G, and G1000-4 cards require XC10G cards.
• G1K-4, ML1000-2, and ML100T-12 cards require XC10G cards if they are installed in Slots 1 to 4
or 14 to 17.
Step 9 If an E1000-2, E1000-2-G, G1000-4, or ML1000-2 Ethernet card is installed, verify that it has a Gigabit
Interface Converter (GBIC) or Small Form-factor Pluggable (SFP) installed. If not, see the “DLP-A469
Install GBIC or SFP Connectors” task on page 21-24.
Step 10 Verify that the OC-N cards (OC-3, OC-3-8, OC-12, OC-12-4, OC-48, OC-48 any slot [AS], and OC-192)
are installed in the slots designated by your site plan.
• OC-3, OC-12, and OC-48 AS cards can be installed in Slots 1 to 6 or 12 to 17.
• OC-3-8 and OC-12-4 cards can be installed in Slots 1 to 4 and 14 to 17.
• OC-48 and OC-192 cards can be installed in Slots 5, 6, 12, or 13.
Step 11 Verify that the correct cross-connect cards are installed in Slots 8 and 10:
• If an OC-192, OC-12-4, or OC-3-8 card is installed, an XC10G card must be installed.
• If an OC-48 AS card is installed in Slots 1 to 4 or 14 to 17, an XC10G card must be installed. If XC
or XCVT cards are installed, the OC-48 AS can be installed only in Slots 5, 6, 12, or 13.
Step 12 Verify that all installed OC-N cards display a solid amber STBY LED.
Step 13 If transponder or muxponder cards are installed (TXP_MR_10G, TXP_MR_2.5G, TXPP_MR_2.5G,
MXP_MR_2.5G, MXPP_MR_2.5G, MXP_2.5G_10G, TXP_MR_10E, and MXP_2.5G_10E), verify
that they are installed in Slots 1 to 6 or 12 to 17 and have GBIC or SFP connectors are installed. If GBICs
or SFP connectors are not installed, complete the “DLP-A469 Install GBIC or SFP Connectors” task on
page 21-24. For more information about TXP and MXP cards, refer to the Cisco ONS 15454 DWDM
Installation and Operations Guide.
Step 14 If Fibre Channel cards (FC-MR-4) are installed, verify one of the following:
• If XC10G cross-connect cards are installed, the FC-MR-4 is installed in Slots 1 to 6 or 12 to 17 and
displays a solid green ACT (Active) LED.
• If XCVT cross-connect cards are installed, the FC-MR-4 is installed in Slots 5 to 6 or 12 to 13 and
displays a solid green ACT (Active) LED.
Step 15 Verify that fiber-optic cables (fiber) are installed and connected to the locations indicated in the site plan.
If the fiber is not installed, complete the “NTP-A247 Install Fiber-Optic Cables on OC-N Cards”
procedure on page 2-14.
Step 16 Verify that fiber is routed correctly in the shelf assembly and fiber boots are installed properly. If the
fiber is not routed on the shelf assembly, complete the “NTP-A245 Route Fiber-Optic Cables” procedure
on page 2-17. If the fiber boots are not installed, complete the “DLP-A45 Install the Fiber Boot” task on
page 17-54.
Step 17 Verify that the software release shown on the LCD matches the software release indicated in your site
plan. If the release does not match, perform one of the following procedures:
• Perform a software upgrade using a Cisco ONS 15454 software CD. Refer to the release-specific
software upgrade document for instructions.
• Replace the TCC2/TCC2P cards with cards containing the correct release. Refer to the
Cisco ONS 15454 Troubleshooting Guide.
Stop. You have completed this procedure.