EasyManuals Logo

Cisco ONS 15454 Series User Manual

Cisco ONS 15454 Series
850 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #717 background imageLoading...
Page #717 background image
20-73
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 20 DLPs A300 to A399
DLP-A386 Install Electrical Cables on the UBIC-V EIAs
Figure 20-16 Partially Cabled UBIC-V
Step 5
If available, tie wrap or lace the cables to the tie bar according to Telcordia standards (GR-1275-CORE)
or local site practice.
Note When routing the electrical cables, be sure to leave enough room in front of the alarm and timing
panel so that it is accessible for maintenance activity.
Step 6 Return to your originating procedure (NTP).
115075

Table of Contents

Other manuals for Cisco ONS 15454 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco ONS 15454 Series and is the answer not in the manual?

Cisco ONS 15454 Series Specifications

General IconGeneral
Supported InterfacesEthernet
ManagementCisco Transport Controller (CTC), TL1, SNMP
Power Supply-48 VDC or AC (depending on power supply module)
Operating Temperature0 to 50°C (32 to 122°F) - varies by module
Storage Temperature-40°C to 70°C (-40 to 158°F)
Relative Humidity5 to 95%, noncondensing
Supported ProtocolsSONET/SDH, Ethernet, OTN
Platform TypeMulti-service transport platform

Related product manuals