19-13
Cisco ONS 15454 Procedure Guide, R5.0
September 2005
Chapter 19 DLPs A200 to A299
DLP-A219 Provision a VT Tunnel Route
• Switch on PDI-P—For STS circuits, check this box if you want traffic to switch when an STS
payload defect indicator is received. Unavailable for VT circuits.
Step 2 Return to your originating procedure (NTP).
DLP-A219 Provision a VT Tunnel Route
Step 1 In the Circuit Creation wizard in the Route Review and Edit page, click the source node icon if it is not
already selected. Arrows indicate the available spans for routing the tunnel from the source node.
Step 2 Click the arrow of the span you want the VT tunnel to travel. The arrow turns white. In the Selected Span
area, the From and To fields show the slot and port that will carry the tunnel. The source STS appears.
Step 3 If you want to change the source STS, change it in the Source STS field; otherwise, continue with the
next step.
Step 4 Click Add Span. The span is added to the Included Spans list and the span arrow turns blue.
Step 5 Repeat Steps 3 and 4 until the tunnel is provisioned from the source to the destination node through all
intermediary nodes.
Step 6 Return to your originating procedure (NTP).
DLP-A220 Provision E-Series Ethernet Ports
Step 1 In node view, double-click the Ethernet card that you want to provision.
Step 2 Click the Provisioning > Port tabs.
Purpose This task provisions the route for a manually routed VT tunnel.
Tools/Equipment None
Prerequisite Procedures DLP-A60 Log into CTC, page 17-66
The Circuit Creation wizard Route Review and Edit page must be open.
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Provisioning or higher
Purpose This task enables the E100T-12, E100T-G, E1000-2, and E1000-2-G
Ethernet ports to carry traffic.
Tools/Equipment None
Prerequisite Procedures DLP-A60 Log into CTC, page 17-66
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Provisioning or higher