iii
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
CONTENTS
About this Guide xlv
Revision History xlv
Document Objectives xlv
Audience xlvi
Document Organization xlvi
Chapter (Director Level) xlvi
Non-Trouble Procedure (NTP) xlix
Detailed Level Procedure (DLP) xlix
Related Documentation xlix
Document Conventions xlix
Obtaining Optical Networking Information lvi
Where to Find Safety and Warning Information lvi
Cisco Optical Networking Product Documentation CD-ROM lvi
Obtaining Documentation, Obtaining Support, and Security Guidelines lvi
CHAPTER
1 Install the Shelf and Backplane Cable 1-1
Before You Begin 1-1
Required Tools and Equipment 1-2
Cisco-Supplied Materials 1-2
User-Supplied Materials 1-3
Tools Needed 1-4
Test Equipment 1-4
NTP- A1 Unpack and Inspect the ONS 15454 Shelf Assembly 1-4
NTP- A2 Install the Shelf Assembly 1-5
NTP- A3 Open and Remove the Front Door 1-6
NTP- A4 Remove the Backplane Covers 1-7
NTP- A5 Install the EIAs 1-7
NTP- A6 Install the Power and Ground 1-9
NTP- A7 Install the Fan-Tray Assembly 1-10
NTP- A119 Install the Alarm Expansion Panel 1-12
NTP- A8 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections 1-15
NTP- A120 Install an External Wire-Wrap Panel to the AEP 1-16
NTP- A9 Install the Electrical Card Cables on the Backplane 1-21