TASKS
xxxv
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
DLP-A1 Unpack and Verify the Shelf Assembly 17-1
DLP-A2 Inspect the Shelf Assembly 17-2
DLP-A3 Reverse the Mounting Bracket to Fit a 19-inch (482.6 mm) Rack 17-2
DLP-A4 Install the External Brackets and Air Filter 17-4
DLP-A5 Mount the Shelf Assembly in a Rack (One Person) 17-5
DLP-A6 Mount the Shelf Assembly in a Rack (Two People) 17-6
DLP-A7 Mount Multiple Shelf Assemblies in a Rack 17-7
DLP-A8 Open the Front Door 17-8
DLP-A9 Remove the Front Door 17-9
DLP-A10 Remove the Lower Backplane Cover 17-10
DLP-A11 Remove the Backplane Sheet Metal Cover 17-11
DLP-A12 Install a BNC or High-Density BNC EIA 17-12
DLP-A13 Install an SMB EIA 17-15
DLP-A14 Install the AMP Champ EIA 17-16
DLP-A16 Connect the Office Ground to the ONS 15454 17-18
DLP-A17 Connect Office Power to the ONS 15454 Shelf 17-19
DLP-A18 Turn On and Verify Office Power 17-21
DLP-A19 Install Alarm Wires on the Backplane 17-22
DLP-A20 Install Timing Wires on the Backplane 17-25
DLP-A21 Install LAN Wires on the Backplane 17-26
DLP-A22 Install the TL1 Craft Interface 17-27
DLP-A23 Install DS-1 Cables Using Electrical Interface Adapters (Balun) 17-28
DLP-A24 Install DS-1 AMP Champ Cables on the AMP Champ EIA 17-29
DLP-A25 Install Coaxial Cable With BNC Connectors 17-32
DLP-A26 Install Coaxial Cable With High-Density BNC Connectors 17-33
DLP-A27 Install Coaxial Cable with SMB Connectors 17-33
DLP-A28 Route Coaxial Cables 17-35
DLP-A29 Route DS-1 and DS-3/EC-1 Twisted-Pair Cables 17-36
DLP-A30 Install Ferrites to Power Cabling 17-37
DLP-A31 Attach Ferrites to Wire-Wrap Pin Fields 17-38
DLP-A32 Inspect the Shelf Installation and Connections 17-39