PROCEDURES
xxix
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
NTP-A1 Unpack and Inspect the ONS 15454 Shelf Assembly 1-4
NTP-A2 Install the Shelf Assembly 1-5
NTP-A3 Open and Remove the Front Door 1-6
NTP-A4 Remove the Backplane Covers 1-7
NTP-A5 Install the EIAs 1-7
NTP-A6 Install the Power and Ground 1-9
NTP-A7 Install the Fan-Tray Assembly 1-10
NTP-A119 Install the Alarm Expansion Panel 1-12
NTP-A8 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections 1-15
NTP-A120 Install an External Wire-Wrap Panel to the AEP 1-16
NTP-A9 Install the Electrical Card Cables on the Backplane 1-21
NTP-A10 Route Electrical Cables 1-22
NTP-A11 Install the Rear Cover 1-22
NTP-A12 Install Ferrites 1-29
NTP-A13 Perform the Shelf Installation Acceptance Test 1-30
NTP-A15 Install the Common Control Cards 2-2
NTP-A16 Install the OC-N Cards 2-6
NTP-A17 Install the Electrical Cards 2-8
NTP-A246 Install Ethernet Cards and Connectors 2-10
NTP-A274 Install the FC_MR-4 Cards 2-11
NTP-A316 Install the Filler Cards 2-13
NTP-A247 Install Fiber-Optic Cables on OC-N Cards 2-14
NTP-A245 Route Fiber-Optic Cables 2-17
NTP-A116 Remove and Replace a Card 2-17
NTP-A20 Replace the Front Door 2-18
NTP-A260 Set Up Computer for CTC 3-1
NTP-A234 Set Up CTC Computer for Local Craft Connection to the ONS 15454 3-2
NTP-A235 Set Up a CTC Computer for a Corporate LAN Connection to the ONS 15454 3-4
NTP-A236 Set Up a Remote Access Connection to the ONS 15454 3-5
NTP-A23 Log into the ONS 15454 GUI 3-6
NTP-A24 Verify Card Installation 4-2