Contents
x
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
NTP- A165 Import Network Element Defaults 15-36
NTP- A166 Export Network Element Defaults 15-38
CHAPTER
16 Power Down the Node 16-1
NTP- A114 Power Down the Node 16-1
CHAPTER
17 DLPs A1 to A99 17-1
DLP- A1 Unpack and Verify the Shelf Assembly 17-1
DLP- A2 Inspect the Shelf Assembly 17-2
DLP- A3 Reverse the Mounting Bracket to Fit a 19-inch (482.6 mm) Rack 17-2
DLP- A4 Install the External Brackets and Air Filter 17-4
DLP- A5 Mount the Shelf Assembly in a Rack (One Person) 17-5
DLP- A6 Mount the Shelf Assembly in a Rack (Two People) 17-6
DLP- A7 Mount Multiple Shelf Assemblies in a Rack 17-7
DLP- A8 Open the Front Door 17-8
DLP- A9 Remove the Front Door 17-9
DLP- A10 Remove the Lower Backplane Cover 17-10
DLP- A11 Remove the Backplane Sheet Metal Cover 17-11
DLP- A12 Install a BNC or High-Density BNC EIA 17-12
DLP- A13 Install an SMB EIA 17-15
DLP- A14 Install the AMP Champ EIA 17-16
DLP- A16 Connect the Office Ground to the ONS 15454 17-18
DLP- A17 Connect Office Power to the ONS 15454 Shelf 17-19
DLP- A18 Turn On and Verify Office Power 17-21
DLP- A19 Install Alarm Wires on the Backplane 17-22
DLP- A20 Install Timing Wires on the Backplane 17-25
DLP- A21 Install LAN Wires on the Backplane 17-26
DLP- A22 Install the TL1 Craft Interface 17-27
DLP- A23 Install DS-1 Cables Using Electrical Interface Adapters (Balun) 17-28
DLP- A24 Install DS-1 AMP Champ Cables on the AMP Champ EIA 17-29
DLP- A25 Install Coaxial Cable With BNC Connectors 17-32
DLP- A26 Install Coaxial Cable With High-Density BNC Connectors 17-33
DLP- A27 Install Coaxial Cable with SMB Connectors 17-33
DLP- A28 Route Coaxial Cables 17-35
DLP- A29 Route DS-1 and DS-3/EC-1 Twisted-Pair Cables 17-36
DLP- A30 Install Ferrites to Power Cabling 17-37
DLP- A31 Attach Ferrites to Wire-Wrap Pin Fields 17-38
DLP- A32 Inspect the Shelf Installation and Connections 17-39
DLP- A33 Measure Voltage 17-39