Index
IN-15
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
upgrade from a linear ADM 13-11, 13-12
upgrade to a BLSR 13-13, 13-15
verify timing after dropping a node 18-67
path trace
see J1 path trace
see J2 path trace
PCM
17-85
PC setup
connect PC to ONS 15454
3-1
corporate LAN connection 3-4
craft connection (requiring IP address
reconfiguration)
17-56
craft connection (without multiple IP
reconfigurations)
17-61
craft connection using automatic host detection 17-61
craft connection using DHCP 17-58
disable proxy service 17-65
install browser 3-2
install JRE 20-24
remote (modem) access 3-5
requirements 20-24
performance monitoring 8-1 to 8-7
clear current (displayed) counts 18-13
clear stored counts 20-35
enable or disable IPPM 18-9
modify FC_MR-4 thresholds 11-5
modify thresholds for electrical cards 11-2
modify thresholds for OC-N cards 11-2
monitor selected signal 20-34
PM clearing privilege 22-4
pointer justification counts see pointer justification
counts
refresh 15-minute intervals
18-11
refresh counts, different port 19-43
refresh Ethernet PM counts 20-33
refresh Ethernet time interval 19-42
refresh FC_MR-4 PM counts 20-39
refresh one-day intervals 18-11
set auto-refresh interval 19-43
threshold crossing alert see TCA
view Ethernet history PMs 19-41
view Ethernet utilization PMs 19-39
view far-end counts 18-13
view near-end counts 18-12
view OC-N PMs 22-1
Phillips
#2 screw driver
1-4
mounting screws 1-2
plastic backplane cover 1-22
plug-in unit see card
pointer justification counts
enable/disable
18-7
purpose 18-7
point-to-point
acceptance test
5-4
provision 5-3
upgrade to a linear ADM 13-2, 13-5
upgrade to a path protection 13-11, 13-12
upgrade to a two-fiber BLSR 13-8
portless transmux 6-20
ports
CE-100T-8 Ethernet
6-82
CE-100T-8 POS ports 6-84
change OC-N port to SDH 18-53
default UDP port for SNMP 19-56
E-Series Ethernet 19-13
G-Series Ethernet 19-16
IIOP listener port 17-74
provision for 1+1 protection 17-81
provision for optimized 1+1 protection 17-40
provision G-Series ports for transponder mode 6-78
put optical ports in⁄ out of service 19-9
status on LCD 20-31
UDP 4-12
power
coat bare conductors
17-20
connect office power to shelf 17-19
measure voltage 17-39
set power monitor thresholds 4-6