EasyManua.ls Logo

Toshiba GR200 Series - (ii)-2 Output signal to BO; (iii) Receiving “Selection command On” from the local-end; (iii)-1 Input signal generated at the local-end.

Toshiba GR200 Series
1770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6F2S1914 (0.49)
GRL200 (Soft 033 & 037)
- 623 -
Output signal to BO
The SPOS01 function, in Figure 4.1-4, can issue a “Select success” signal at the output point
“SPOS01_FSL_BO_CSF” when the SPOS01 function determines that the Select command Off
(Remote-OFF-Control) signal is true. If the SPOS01 function determines that the Remote-
OFF-Control signal is not true, the SPOS01 function returns to the Wait for a command
stage.
(iii) Receiving “Selection command On” from the local-end
Figure 4.1-5 outlines the reception of the selection command On from the local-end.
Signal reception
from the front panel
Select command On from front panel
Signal output
Select
decision
Success
Failed
Selection logic
Selection logics
Cancel logic
Wait for a next command
Cancel command
Wait for a command
Operate logic
Operate command
Cancel logic
Operate logic
Select command Off from remote-end
Select command Off from front panel
Select command On by the PLC
Select command Off by the PLC
Select command On from remote-end
Figure 4.1-5 Outline of selection commandOn
Input signal generated at the local-end.
Figure 4.1-6 shows the select logic when a “Select command On (Local-ON-Control)” signal is
applied to the SPOS01 function. The signal is provided when an On key is pressed on the
IED front panel; the user is not required to map the signal from the IEC61850 communication.
Note that the user should set the scheme switch [SPOS01-CTRAHMI] to SBO when operation
from the IED front panel is required; we discuss how to set this in chapter
User interface:
Control sub-menu
.

Table of Contents

Related product manuals