EasyManua.ls Logo

Toshiba GR200 Series - (ix)-1 Input signal from the PLC function

Toshiba GR200 Series
1770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6F2S1914 (0.49)
GRL200 (Soft 033 & 037)
- 923 -
PLC logic programmed
by the user
P3control by the PLC function
Signal output
Select
decision
Success
Failed
Selection logic
P2 control from the remote-end
P3 control from the remote-end
P1 control from the local-end
P2 control from the local-end
P1 control by the PLC function
P3 control from the local-end
P2 control by the PLC function
Select stage
Cancel logic
Wait for a command
Cancel command
Wait for a command
Operate logic
Operate command
Cancel logic
Operate logic
P1 control from the remote-end
Figure 4.9-18 Outline of select command P3-control’
Input signal from the PLC function
Figure 4.9-9 shows the select logic when a “Select command P3-Control (PLC-P3-Control)”
signal is generated by the PLC function. There are two input points for the reception of this
signal, like in the “Select Command P1-Control (PLC-P1-Contol)” signal. That is, if interlock
checking is required, use the connection point (PLC#1; e.g., DEV01_P3_INTERLOCK).
Alternatively, if the interlock check is not required, use the connection point (PLC#2; e.g.,
DEV01_P3_COMMAND). PLC#1 and PLC#2 are shown in Table 4.9-4.

Table of Contents

Related product manuals